Re: Machines A and B both shrink-wrap CDs continuously, each working at a
[#permalink]
Updated on: 26 Jul 2025, 23:07
Let Machine A's shrink-wrapping rate per hour be x
As Machine B is faster rate at shrink-wrapping, B's rate of production hour will be 50/100x (because B is 50% faster than A).
24(50/100x - x) = 48,000
24(3/2x - x) = 48,000
36x-24x = 48,000
12x= 48,000
X = 4,000
Originally posted by
sandysam27 on 25 Jul 2025, 23:53.
Last edited by
sandysam27 on 26 Jul 2025, 23:07, edited 1 time in total.