Last visit was: 30 Dec 2024, 08:06 It is currently 30 Dec 2024, 08:06

Close

GRE Prep Club Daily Prep

Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GRE score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History

Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.

Close

Request Expert Reply

Confirm Cancel
User avatar
Retired Moderator
Joined: 07 Jun 2014
Posts: 4815
Own Kudos [?]: 11278 [11]
Given Kudos: 0
GRE 1: Q167 V156
WE:Business Development (Energy and Utilities)
Send PM
User avatar
Retired Moderator
Joined: 07 Jun 2014
Posts: 4815
Own Kudos [?]: 11278 [0]
Given Kudos: 0
GRE 1: Q167 V156
WE:Business Development (Energy and Utilities)
Send PM
avatar
Intern
Intern
Joined: 01 May 2019
Posts: 6
Own Kudos [?]: 9 [0]
Given Kudos: 0
Send PM
Verbal Expert
Joined: 18 Apr 2015
Posts: 30554
Own Kudos [?]: 36906 [0]
Given Kudos: 26108
Send PM
Re: A machine works at a constant rate and produces a bolts in 1 [#permalink]
1
Expert Reply
What do you mean ?? about numbers
avatar
Intern
Intern
Joined: 19 Feb 2020
Posts: 1
Own Kudos [?]: 2 [2]
Given Kudos: 0
Send PM
Re: A machine works at a constant rate and produces a bolts in 1 [#permalink]
2
I am just guessing.

so just take - a produced in 15 min
b produced in c Hrs

hence, c hrs into 60c min

eqn becomes - a-------15
b-------60c
Its easier to take c as 1
so if a is 5 and multiplied by 3 gives 15 (5*3= 15)

therefore, b * 3= 60
b= 20

a=5, c=1, b=20 for completing an equation and moreover any other value taken for a,b,c would be a multiple of 5,1,20 resp.
avatar
Intern
Intern
Joined: 19 Feb 2020
Posts: 28
Own Kudos [?]: 1 [0]
Given Kudos: 0
Send PM
Re: A machine works at a constant rate and produces a bolts in 1 [#permalink]
b = 4a, so
4a , 3ac => 4, 3c
so the two quantities have different result for smaller c and larger c,
avatar
Intern
Intern
Joined: 08 Apr 2020
Posts: 9
Own Kudos [?]: 4 [0]
Given Kudos: 0
Send PM
Re: A machine works at a constant rate and produces a bolts in 1 [#permalink]
babatee wrote:
sandy wrote:
Explanation

Plug in values.

If a = 5 and c = 1, then b = 20. In that situation Quantity A is larger; eliminate choices (B) and (C).

Plug In again to see if this is always the case. If a = 100 and c = 2, then b = 800.

Quantity A is still larger. There isn’t anything else you can try that would change the values, so choice A is the best answer.


How did you go about picking the numbers to plug in?


I'm wondering if this is a misprint. I have the text book and I've noticed a number of misprints that I had to check with other sources. I'd be wary though. Its far more likely that there is some subtle detail we are missing. I still don't understand this question. The explanation on this site is copied from the textbook and I don't see how they're getting "A" as the answer. I can pick numbers that make "B" the answer as well so I'm unsure how they are rationalizing it. Please someone help
avatar
Manager
Manager
Joined: 09 Mar 2020
Posts: 164
Own Kudos [?]: 202 [4]
Given Kudos: 0
Send PM
Re: A machine works at a constant rate and produces a bolts in 1 [#permalink]
4
The machine produces 1 bolt (a) in 15 min. Thus, it produces 4 bolts (b) in 1 hour (c) (not in minutes).
Option A: 4
Option B: 3*1*1 = 3
So option A is greater.

After reading the comments I noticed that, many people are converting c from hours to minutes. That is not necessary to do here. Unless and until it is stated in the question that give your answer in bolts produced per minute, then only we need to convert. Since, in this question nothing like that is stated, just substitute the value of c and a as is.
avatar
Intern
Intern
Joined: 03 May 2020
Posts: 1
Own Kudos [?]: 2 [2]
Given Kudos: 0
Send PM
Re: A machine works at a constant rate and produces a bolts in 1 [#permalink]
1
1
okay so firstly never assume anything is an integer unless clearly implied or explicitly stated. In this case, C is not necessarily an integer you can say 0.5 hours also.

here is an easy method to solve algebraically without any doubts:
b bolts will be produced in 60c minutes and b bolts will also be produced in 15b/a minutes so 60c = 15b/a b=4ac 4ac > 3ac since ac is positive. answer A
Intern
Intern
Joined: 13 Sep 2020
Posts: 2
Own Kudos [?]: 0 [0]
Given Kudos: 10
Send PM
Re: A machine works at a constant rate and produces a bolts in 1 [#permalink]
Sharanjay wrote:
okay so firstly never assume anything is an integer unless clearly implied or explicitly stated. In this case, C is not necessarily an integer you can say 0.5 hours also.

here is an easy method to solve algebraically without any doubts:
b bolts will be produced in 60c minutes and b bolts will also be produced in 15b/a minutes so 60c = 15b/a b=4ac 4ac > 3ac since ac is positive. answer A

perfect
Senior Manager
Senior Manager
Joined: 23 Jan 2021
Posts: 294
Own Kudos [?]: 172 [0]
Given Kudos: 81
Concentration: , International Business
Send PM
Re: A machine works at a constant rate and produces a bolts in 1 [#permalink]
Turtletobb wrote:
babatee wrote:
sandy wrote:
Explanation

Plug in values.

If a = 5 and c = 1, then b = 20. In that situation Quantity A is larger; eliminate choices (B) and (C).

Plug In again to see if this is always the case. If a = 100 and c = 2, then b = 800.

Quantity A is still larger. There isn’t anything else you can try that would change the values, so choice A is the best answer.


How did you go about picking the numbers to plug in?


I'm wondering if this is a misprint. I have the text book and I've noticed a number of misprints that I had to check with other sources. I'd be wary though. Its far more likely that there is some subtle detail we are missing. I still don't understand this question. The explanation on this site is copied from the textbook and I don't see how they're getting "A" as the answer. I can pick numbers that make "B" the answer as well so I'm unsure how they are rationalizing it. Please someone help


You are always safe to pick up any random number that you want in case of any algebric equation to avoid. I do not think there is any issue as you mentioned. COuld you be more specific, please?
Intern
Intern
Joined: 15 Jul 2024
Posts: 9
Own Kudos [?]: 2 [0]
Given Kudos: 28
Send PM
Re: A machine works at a constant rate and produces a bolts in 1 [#permalink]
I have done this algebraically,

a bolts in 15 min --- (i)

b bolts in c hours
=> b bolts in 60c min
=> b/60c bolts in 1 min
=> 15b/60c bolts in 15 min ---(ii)

number of bolts must be same in 15 minutes
So, a=15b/60c
=> a=b/4c
=> b=4ac which is term A
term B = 3ac

Hence A>B. Option (A)
Prep Club for GRE Bot
Re: A machine works at a constant rate and produces a bolts in 1 [#permalink]
Moderators:
GRE Instructor
88 posts
GRE Forum Moderator
37 posts
Moderator
1116 posts
GRE Instructor
234 posts

Powered by phpBB © phpBB Group | Emoji artwork provided by EmojiOne