Bob is a supervisor in a automobile factory. Bob requires sheets of
[#permalink]
22 Nov 2022, 21:46
Question Stats:
100% (00:58) correct
0% (00:00) wrong
based on 1 sessions
Hide
Show
timer Statistics
Bob is a supervisor in a automobile factory. Bob requires sheets of thickness 3 mm with a tolerance of 0.1mm . Two manufacturers have supplied him samples of metal sheets. Bob finds that the sheets from manufacturer A have a mean thickness of 2.97 mm and a standard deviation of 1.37. The sheets from manufacturer B have a mean thickness of 3.03 mm and a standard deviation of 21.37. If you were in Bob's position, whom would you place orders with, Manufacturer A or B ?