Last visit was: 24 Nov 2024, 23:05 It is currently 24 Nov 2024, 23:05

Close

GRE Prep Club Daily Prep

Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GRE score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History

Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.

Close

Request Expert Reply

Confirm Cancel
Verbal Expert
Joined: 18 Apr 2015
Posts: 30018
Own Kudos [?]: 36388 [3]
Given Kudos: 25928
Send PM
Retired Moderator
Joined: 09 Jan 2021
Posts: 576
Own Kudos [?]: 846 [2]
Given Kudos: 194
GRE 1: Q167 V156
GPA: 4
WE:Analyst (Investment Banking)
Send PM
Manager
Manager
Joined: 25 Aug 2020
Posts: 80
Own Kudos [?]: 67 [1]
Given Kudos: 65
Send PM
Intern
Intern
Joined: 23 May 2020
Posts: 17
Own Kudos [?]: 2 [0]
Given Kudos: 8
Send PM
Re: At a certain factory, machines A and B have a maximum per-day producti [#permalink]
But here p is less than q , so time taken to produce p parts will be less by machine A than machine B which produce q parts that are more than p, so howcome : Qty A > Qty B ??

Please explain
Retired Moderator
Joined: 16 Apr 2020
Status:Founder & Quant Trainer
Affiliations: Prepster Education
Posts: 1546
Own Kudos [?]: 3224 [1]
Given Kudos: 172
Location: India
WE:Education (Education)
Send PM
Re: At a certain factory, machines A and B have a maximum per-day producti [#permalink]
1
wewake06298 wrote:
But here p is less than q , so time taken to produce p parts will be less by machine A than machine B which produce q parts that are more than p, so howcome : Qty A > Qty B ??

Please explain


We are making 1000 parts at a rate of \(p\) units/day and \(q\) units/day

Example:
p = 40 units/day
q = 50 units/day

which one is greater - \(\frac{1000}{40}\) or \(\frac{1000}{50}\) ?
avatar
Intern
Intern
Joined: 22 Oct 2020
Posts: 2
Own Kudos [?]: 6 [4]
Given Kudos: 0
Send PM
Re: At a certain factory, machines A and B have a maximum per-day producti [#permalink]
4
Ks1859 wrote:
Solution:

p<q<100 i.e. The time taken by A to complete a work>the time taken by B to complete a work
Thus in order to do the consignment, A will take more time than B

Qty A>Qty B

IMO A

Hope this helps!



.......
PS - This does not hold true is you assume p =98 and q=99. Because there is no definitive relationship between p and q, the answer can't be determined. The right answer IMO should be D
avatar
Intern
Intern
Joined: 22 Oct 2020
Posts: 2
Own Kudos [?]: 6 [2]
Given Kudos: 0
Send PM
Re: At a certain factory, machines A and B have a maximum per-day producti [#permalink]
2
A does not hold true every time. If one assumes p =98 and q=99, the number of days for both is 11. And Because there is no definitive relationship between p and q, the answer can't be determined. The right answer IMO should be D
Retired Moderator
Joined: 09 Jan 2021
Posts: 576
Own Kudos [?]: 846 [2]
Given Kudos: 194
GRE 1: Q167 V156
GPA: 4
WE:Analyst (Investment Banking)
Send PM
At a certain factory, machines A and B have a maximum per-day producti [#permalink]
2
MinakshiS wrote:
Ks1859 wrote:
Solution:

p<q<100 i.e. The time taken by A to complete a work>the time taken by B to complete a work
Thus in order to do the consignment, A will take more time than B

Qty A>Qty B

IMO A

Hope this helps!



.......
PS - This does not hold true is you assume p =98 and q=99. Because there is no definitive relationship between p and q, the answer can't be determined. The right answer IMO should be D


Hi There!

When you divide 1000 by 98 or by 99 you DO NOT GET THE SAME QUOTIENT. Let me try helping you with this. **Use calculator for precise values**.

\(\frac{1000}{99}=10.1010101010101--Machine B\)
\(\frac{1000}{98}=10.20408163265306--Machine A\)

So the above values are simply the time required to complete the work in days and the decimal value is the extra part of another day after the 10 days to finish the 1000 unit.
Because if we only consider 11 days then Machine A which does 98 units of work in 1 day will do 1078 units we do not need those extra 78 units, as the question only asks for 1000 units make sure you only find the value corresponding to 1000. Do no round off. Similarly, for Machine B.
Now, you tell me isn't 10.20>10.10. Just because these are some decimal values, we can't ignore them.


The Correct Answer is A because of the above reason. As it takes A more time as it does less units of work per day than B does.

Ask for further assistance.

P.S:. Welcome to the GRE Club

Hope this helps!
Manager
Manager
Joined: 25 Aug 2020
Posts: 80
Own Kudos [?]: 67 [2]
Given Kudos: 65
Send PM
Re: At a certain factory, machines A and B have a maximum per-day producti [#permalink]
2
MinakshiS wrote:
A does not hold true every time. If one assumes p =98 and q=99, the number of days for both is 11. And Because there is no definitive relationship between p and q, the answer can't be determined. The right answer IMO should be D



Hi,

I think you understood that if we compare with absolute values in your case, p=98, q=99 , of course A) is bigger in any case, but the question asks "days" , it may mean decimal part should be rounded up, so both your cases should be 11. Is my understanding about your post correct ?

Best,
Gocha
Retired Moderator
Joined: 16 Apr 2020
Status:Founder & Quant Trainer
Affiliations: Prepster Education
Posts: 1546
Own Kudos [?]: 3224 [2]
Given Kudos: 172
Location: India
WE:Education (Education)
Send PM
At a certain factory, machines A and B have a maximum per-day producti [#permalink]
2
MinakshiS wrote:
A does not hold true every time. If one assumes p =98 and q=99, the number of days for both is 11. And Because there is no definitive relationship between p and q, the answer can't be determined. The right answer IMO should be D


MinakshiS
Let us solve this without assuming any values!

We know \(p < q < 100\). Also that \(p > 0\) and \(q > 0\)

Col. A: \(\frac{1000}{p}\)
Col. B: \(\frac{1000}{q}\)

Since \(p\) and \(q\) are both positive, we can cross-multiply the denominators in both the columns;

Col. A: \(1000q\)
Col. B: \(1000p\)

Divide both the columns with 1000;

Col. A: \(q\)
Col. B: \(p\)

Now which one is greater?
User avatar
GRE Prep Club Legend
GRE Prep Club Legend
Joined: 07 Jan 2021
Posts: 5053
Own Kudos [?]: 75 [0]
Given Kudos: 0
Send PM
Re: At a certain factory, machines A and B have a maximum per-day producti [#permalink]
Hello from the GRE Prep Club BumpBot!

Thanks to another GRE Prep Club member, I have just discovered this valuable topic, yet it had no discussion for over a year. I am now bumping it up - doing my job. I think you may find it valuable (esp those replies with Kudos).

Want to see all other topics I dig out? Follow me (click follow button on profile). You will receive a summary of all topics I bump in your profile area as well as via email.
Prep Club for GRE Bot
Re: At a certain factory, machines A and B have a maximum per-day producti [#permalink]
Moderators:
GRE Instructor
84 posts
GRE Forum Moderator
37 posts
Moderator
1111 posts
GRE Instructor
234 posts

Powered by phpBB © phpBB Group | Emoji artwork provided by EmojiOne