GRE Question of the Day (September 21st)MathA manufacturer can save X dollars per unit in production costs by overproducing in certain seasons. If storage costs for the excess are y dollars per unit per day ( X > Y), which of the following expresses the maximum number of days that n excess units can be stored before the storage costs exceed the savings on the excess units?
A) \({x - y}\) B) \({(x - y)n}\) C) \({\frac{{x}}{{y}}}\) D) \({\frac{{xn}}{{y}}}\) E) \({\frac{{x}}{{yn}}}\) Correct Answer - C - (click and drag your mouse to see the answer) |